Concrete bridge pier formwork design - Physics Forums

Author: becky

Jun. 05, 2025

Concrete bridge pier formwork design - Physics Forums

Homework Statement



I have to design the formwork system for an octagonal bridge pier similar to the type shown below, plus a headstock.

[PLAIN]http://img577.imageshack.us/img577//prexconcretebridgecolum.jpg


Homework Equations





The Attempt at a Solution



I can use any system I want and I have gathered a number that I can choose from. But I really want to use a system like this one (for the pier):

[PLAIN]http://img594.imageshack.us/img594//placeconcretecolumnform.jpg
[PLAIN]http://img831.imageshack.us/img831//cleaningcolumnformwork.jpg

but I am not certain how to design it to resist the concrete pressure. Does anyone know of any literature that deals with this kind of system in any way?

How do you evaluate the hoop stress of an octagonal pressure vessel like the pier form or iregular shaped and sloping pressure vessel such as the pier cap form? Is the weight of concrete and formwork of the pier cap transferred through the pier form walls axially to the ground? With these two questions answered would I have enough information to pick a steel thickness and grade and also design a connection for the two halves? As a first approximation, you would consider fresh concrete as a viscous fluid with a density 2.5 times that of water. So hydrostatic pressure (increases with depth) is a primary consideration. The spacing of fasteners of the two halves has to be looked at, as well as local deformation.

Since the wall looks relatively thin, you may want to look at possible bulging of the wall.

The friction between the wall and the concrete will transfer some of the concrete weight through the wall, which means that the bottom part of the wall is under axial compression. "Coke-can" type of buckling should be looked into, but probably not significant because the "hydrostatic pressure" of concrete inside puts the wall in circumferential tension.

Also, add a factor for the vibration of concrete after it is poured.

These are some thoughts, hope they help. Thanks for the reply.

As a first approximation, you would consider fresh concrete as a viscous fluid with a density 2.5 times that of water. So hydrostatic pressure (increases with depth) is a primary consideration. The spacing of fasteners of the two halves has to be looked at, as well as local deformation.

We've been given a value of kg/m^3 for the concrete density. From my calcs the concrete will be limited by setting so it won't reach the full hydrostatic pressure. So the spacing of the fasteners will get closer as we get closer to the ground and then be evenly spaced where the concrete has begun to set and lose its fluid properties.

Since the wall looks relatively thin, you may want to look at possible bulging of the wall.

The friction between the wall and the concrete will transfer some of the concrete weight through the wall, which means that the bottom part of the wall is under axial compression. "Coke-can" type of buckling should be looked into, but probably not significant because the "hydrostatic pressure" of concrete inside puts the wall in circumferential tension.

Also, add a factor for the vibration of concrete after it is poured.

So from this I gather the structure has to resist the lateral concrete pressure, as well as it's own weight and the weight of the concrete on the sloping part at the top of the form as well as the concrete adjacent the side walls due to friction. Does that sound right? And since it is thin walled there is a high chance that bulging might be the limiting factor.

I think the "coke-can" buckling you talk about is what we would call twisiting which will be resisted by adding in bracing, which will also resist any other horizontal loads on the structure. And I haven't the code with me but I believe it specifies a factor for vibration of the concrete.

So what my question now is: how could I model this structure? What I really want to do is a few hand calcs that give me an idea of the thickness of steel, and how many bolts I need so that this thing doesn't explode or bulge out into a pear when I fill it with concrete. How can I calculate the state of stress and strain in this structure? For the setting part, there is usually a limit of how high the concrete can be poured at anyone time. The hydrostatic pressure can be calculated based on this height.

If the concrete is in fact poured continuously to the top, some sort of estimate of the concrete setting can be applied, but you want to be extremely cautious in case they pour pea soup in the form!

Unless the whole column is poured in one shot, spacing of the fasteners would likely to be uniform because the pouring could be stopped at any elevation.

The coke-can buckling is what happens when you step on an empty coke-can, when it makes ring like ripples before it flattens completely. See (Theory of elastic Stability, Stephen Timoshenko). This can be strengthened by adding longitudenal ribs (if necessary).

For the design of the wall, one possibility would be to take a horizontal slice and take each face as a uniformly loaded fixed ended beam. Due to symmetry of the 8 sides, each corner should not rotate. The loading is the hydrostatic pressure. You will need to check that the strength of the plate resists the bending moments at the middle of the face (wl^2/24) and at the fixed ends (wl^2/12).

For the bulging, you will have to decide on an acceptable value (1cm, 2cm, etc.) and design the thickness of the plate accordingly.

Due to the cold-forming of the plate (by bending it to an octagon), there may be residual stresses which could give rise to surprises. So you may want to do some experimental testing.

Make allowances for asymmetrical loading. I don't know how to estimate that. Hope your code has something.

These are my thoughts. Check you code to make sure everything has been considered. I am not experienced in formwork design, so if you have a colleague or a superior in the field, have him/her review your design if this is your first.

How to Choose Equipment for Bridge Construction Solutions

Bridge construction is a complex and multifaceted process that requires careful planning, precision, and the right equipment to ensure successful completion. The choice of equipment significantly impacts the efficiency, safety, and overall quality of the construction project. Here, we will explore the critical factors to consider when choosing equipment for bridge construction and provide insights into various types of equipment essential for different stages of the construction process.

If you are looking for more details, kindly visit our website.

Understanding the Scope and Requirements

Before selecting any equipment, it is crucial to understand the specific requirements and scope of the bridge construction project. This includes:

Bridge Type and Design: The design of the bridge, whether it is a suspension bridge, cable-stayed bridge, arch bridge, or beam bridge, dictates the type of equipment needed. Each design has unique construction challenges and equipment needs.

Project Scale and Complexity: The size and complexity of the bridge project will influence the choice of equipment. Large-scale projects may require more advanced and high-capacity machinery, while smaller projects might be adequately served by less complex equipment.

Site Conditions: The geographical and environmental conditions of the construction site, such as terrain, water bodies, and weather conditions, play a significant role in equipment selection. For example, building a bridge over a river requires specialized equipment like floating cranes and barges.

Load Capacity: Understanding the weight and load-bearing requirements of the bridge helps in selecting the appropriate lifting and transporting equipment.

Key Equipment for Bridge Construction

Cranes

Cranes are indispensable in bridge construction for lifting and moving heavy materials. There are various types of cranes used, including:

Tower Cranes: Ideal for tall bridge structures, providing height and lifting capacity.

Mobile Cranes: Versatile and can be moved around the construction site Mobile Cranes: Versatile and can be moved around the construction site to lift and transport materials.

Gantry Cranes: Often used for constructing large bridge components, these cranes can move heavy sections horizontally and vertically.

Floating Cranes: Essential for bridge construction over water, enabling the lifting of heavy materials from barges.

Pile Driving Equipment

Piles are a critical foundation element in bridge construction, particularly for structures built over water or unstable soil. Pile driving equipment, such as hydraulic pile drivers and vibratory hammers, are used to install piles deep into the ground to ensure a stable foundation.

Concrete Mixing and Placing Equipment

Concrete is a primary material in bridge construction. The equipment used includes:

Batching Plants: Ensure a consistent and high-quality mix of concrete.

Concrete Pumps: Facilitate the transportation of concrete to high or difficult-to-reach areas.

Concrete Vibrators: Remove air bubbles from freshly poured concrete, ensuring its strength and durability.

Transport Equipment

Efficient transportation of materials to the construction site is essential. Equipment such as:

Trucks and Trailers: For hauling materials like steel beams, concrete segments, and other heavy components.

Hydraulic Transporters: Used for moving large and heavy prefabricated sections of the bridge to the assembly site.

Goto Work-sun to know more.

Barges and Tugboats: Crucial for transporting materials over water bodies.

Formwork Systems

Formwork is the temporary mold into which concrete is poured to form the bridge’s structural components. Modern formwork systems are designed for quick assembly and dismantling, reducing construction time. They include:

Timber Formwork: Traditional, flexible, and cost-effective for smaller projects.

Steel Formwork: Durable and reusable, suitable for larger projects.

Plastic Formwork: Lightweight and easy to handle, ideal for repetitive use.

Launching Gantries and Incremental Launching Equipment

For long-span bridges, specialized equipment like launching gantries and incremental launching systems are used to position large prefabricated bridge sections precisely.

Excavators and Earth Movers

These machines prepare the construction site by clearing debris, digging foundations, and moving earth. They include:

Backhoes: Versatile and can perform a variety of tasks.

Bulldozers: Essential for clearing and leveling large areas.

Safety Equipment

Ensuring the safety of workers and the construction site is paramount. Safety equipment includes:

Scaffolding Systems: Provide safe access to elevated work areas.

Personal Protective Equipment (PPE): Helmets, harnesses, gloves, and other gear to protect workers.

Factors to Consider When Choosing Equipment

Efficiency and Productivity: Choose equipment that can complete tasks efficiently, reducing construction time and labor costs.

Reliability and Durability: Invest in reliable equipment that can withstand the demands of the construction site and minimize downtime.

Compatibility and Versatility: Equipment should be versatile and compatible with other machinery and materials used in the project.

Cost and Budget: Consider the overall cost, including purchase, maintenance, and operational expenses, and ensure it fits within the project budget.

Environmental Impact: Select equipment that minimizes environmental disruption and complies with sustainability standards.

Safety Standards: Ensure all equipment meets the required safety standards and certifications to protect workers and the project.

Manufacturer Support: Choose reputable manufacturers who offer reliable after-sales support, training, and maintenance services.

Selecting the right equipment for bridge construction solution is crucial for the success of the project. By considering the specific requirements, site conditions, and project scale, and by choosing reliable, efficient, and safe equipment, construction managers can ensure that their bridge projects are completed on time, within budget, and to the highest standards of quality. The right equipment not only enhances productivity but also contributes to the safety and sustainability of the construction process.