To decide whether to buy solid sodium formate or ready-made solution, compare the total delivered and operating cost per unit of active sodium formate—not the quoted price per tonne of product. Enter each product’s assay or concentration, purchase price, freight, handling, preparation, storage, and loss costs in the worksheet below. Solid is the lower-cost choice when its savings exceed the extra cost of dissolving and handling it; solution is the better economic choice when its preparation and operating advantages outweigh the water and freight you purchase with it. Use your supplier’s current quotation and product documentation for the inputs.
This worksheet is designed for plant procurement, operations, and finance teams comparing solid sodium formate with a purchased solution. It is most useful when both options can meet the same process requirement and the plant can estimate annual consumption and handling costs. If the products differ in specification or suitability for your process, confirm technical acceptance before comparing price. A lower calculated cost does not make a product interchangeable if it fails your operating requirements.
Use metric tonnes throughout the worksheet, or convert every input to another consistent unit before calculating. The recommended comparison basis is one metric tonne of active sodium formate, because one tonne of solid product and one tonne of solution can contain very different quantities of sodium formate. “Active” here means the sodium formate quantity calculated from the supplier’s stated assay or concentration. Confirm how the supplier defines and reports that figure.
For solid material, use the assay as a decimal in the formula; for example, 98% becomes 0.98. For solution, use the sodium formate mass fraction in the same way; for example, 40% by weight becomes 0.40. If a quotation gives a different concentration basis, such as a volume-based measure, request clarification before using it in a mass-based calculation.
Complete one column for each purchasing option. Record costs over the same period and for the same delivery point, such as the plant receiving gate. Include taxes or duties only if they apply to one option and are part of your actual landed cost. Keep one-time equipment investments separate unless you deliberately allocate them across a defined operating period.
| Input | Solid sodium formate | Ready-made solution |
|---|---|---|
| Quoted product price per metric tonne | $_____ / t | $_____ / t |
| Supplier-stated assay or concentration, as a decimal | _____ | _____ |
| Freight and other inbound costs per metric tonne | $_____ / t | $_____ / t |
| Receiving, unloading, and routine handling per metric tonne | $_____ / t | $_____ / t |
| Preparation or conditioning cost per metric tonne of product | $_____ / t | $_____ / t |
| Estimated product loss, as a decimal | _____ | _____ |
| Annual fixed or allocated costs for this option | $_____ / year | $_____ / year |
Add the product price, freight, routine handling, and any preparation cost that is recorded per tonne of received product. Keep annual fixed costs separate for now. If a cost is billed per shipment rather than per tonne, divide it by the tonnes in that shipment to convert it to a per-tonne input. Avoid including the same charge in more than one row.
Delivered product cost per tonne = product price + freight + handling + preparation cost per tonne of product.
Multiply the delivered product cost by the estimated product loss adjustment, then divide by the active fraction. For a loss entered as a decimal, the adjustment is 1 minus the loss; for example, a 2% loss is entered as 0.02, giving an adjustment of 0.98. If you have no defensible loss estimate, enter zero and label the result as excluding losses rather than inventing a figure.
Cost per tonne of active sodium formate = delivered product cost per tonne × (1 − loss fraction) ÷ active fraction.
For a more direct calculation of the cost required to obtain one tonne of usable active material, consider whether losses occur before or after the active fraction is measured. If the loss is a loss of product before use, use the formula above with the loss adjustment applied to usable yield; mathematically, the delivered cost should be divided by the retained fraction, not multiplied by it. Accordingly, use this operational form for procurement comparisons: cost per tonne of usable active material = delivered product cost per tonne ÷ [active fraction × (1 − loss fraction)]. Apply the same definition of loss to both options.
Goto Jiuan Chemical to know more.
Where one option has additional annual equipment, maintenance, or staffing costs, divide that annual amount by the annual tonnes of active sodium formate used. Add the resulting figure to that option’s cost per tonne of active material. For labor and utilities that vary with production, estimate the annual amount using the plant’s actual operating schedule and divide by the same annual active-material requirement. Do not include costs that would occur under both options at the same level unless they genuinely differ.
Adjusted annualized cost per active tonne = cost per tonne of usable active material + option-specific annual costs ÷ annual active sodium formate requirement.
The figures below are hypothetical and are included only to demonstrate the arithmetic; they are not market quotations or Jiuan Chemical pricing. Assume solid material costs $540 per metric tonne delivered and has a documented assay of 98%, while solution costs $260 per metric tonne delivered and has a documented concentration of 40% by weight. Before preparation costs, losses, or annual fixed costs, the solid calculates to about $551 per tonne of active material, while the solution calculates to $650 per tonne of active material.
In this example, solid has an initial advantage of about $99 per tonne of active sodium formate. At a hypothetical annual requirement of 100 tonnes of active material, that difference equals approximately $9,900 per year before site-specific costs. The solution becomes the lower-cost choice if its total operating advantage over solid—including avoided dissolution labor, utilities, equipment, and other relevant costs—exceeds that per-tonne gap. Replace every illustrative value with your own documented inputs before making a purchasing decision.
Confirm the delivery location, packaging, freight basis, minimum order quantity, and any additional fees with each supplier. A price that excludes delivery is not directly comparable with a delivered price. Also verify whether a solution quotation is stated per tonne of solution or per tonne of active sodium formate; confusing these bases can materially distort the worksheet.
For solid, estimate the actual cost of storage, transfer, dissolution, and any required process control. For solution, consider the receiving and storage arrangements your site needs, as well as transport and any process-specific handling. Do not assume that one format automatically requires less labor or lower maintenance: use plant records, equipment requirements, or a clearly labeled estimate. Separate costs that vary by throughput from fixed annual costs so the calculation remains easy to update.
Run at least a low, expected, and high case for inputs that can change, such as freight, annual demand, or preparation cost. If the preferred option changes across plausible cases, the decision is sensitive and should be reviewed with procurement and operations before committing. Recalculate when the supplier’s specification, quote, delivery terms, or plant operating plan changes. Keep the source and date of each input beside the worksheet for a clear audit trail.
The break-even answer is the option with the lower adjusted cost per tonne of usable active sodium formate, provided it meets your plant’s technical and delivery requirements. Compare solid assay and solution concentration on the same basis, then include freight, preparation, handling, losses, and applicable annual costs. The hypothetical example shows how a quoted price advantage can narrow or reverse once operating costs are included; it does not predict which format will be cheaper at your plant.
For your next step, complete the worksheet with current quotations and verified product data, then review the assumptions with operations and procurement. Jiuan Chemical can discuss solid and liquid sodium formate supply requirements with your team; when requesting a quotation, provide your target specification, preferred form, estimated volume, packaging needs, and delivery location. That information helps create a comparison aligned with your actual purchasing and plant conditions.
If you are looking for more details, kindly visit A Break-Even Worksheet for Solid and Liquid Sodium Formate.